Case Study

CEEQUAL WINNING PROJECT USES VOLTEX

CEEQUAL WINNING PROJECT USES VOLTEX

Case Study
Kings Cross Package 4. The tanking material had to succeed where the specified competiton fell short : all weather installation; self-healing/sealing capabilities; one product application ; mechanical not chemical bond to concrete. It also had to meet the specified requirements of BS8102 1990 Grade 4. The solution was 8000m2 of Voltex, containing zero VOC, installed in almost any weather conditions to green concrete, and proven effective on both new and remedial waterproofing projects worldwide. Aided by CETCO holding both ISO 14001 & 9001, and the properties of Voltex, the project achieved its CEEQUAL award, scoring above 75%, and rating Excellent.

Details

Published 07/07/2011

Subjects

CI/SfB subheadings under which this case study is classified:

Contact details

Birkenhead Road,
Wallasey,
Merseyside, CH44 7BU
Tel +44 (0)151 606 5900
Fax +44 (0)151 606 5932

Additional link(s)

The following external links have been provided by the manufacturer:
select

Want to ask a question?

Contact CETCO