Stratford Pedestrian Bridge, London, 2011 - TANALISED Clear Pressure Treated Timber
Case study
TANALISED Clear treated timbers were used in the construction of a pedestrian bridge over Stratford High Street in East London in preparation for the London Olympic Games in July 2012
CI/SfB subheadings under which this document is classified:
Other downloads by this company
Select a download to view more details:
Product catalogue
VACSOL Aqua - Treated Timber An advanced protection for low to medium risk timbers including gene...
Case study
TANALISED treated Larch framing supported an innovative and striking timber house in The Netherla...
Product catalogue
When fire takes hold, time is everything. Precious minutes can mean the difference between life a...