Tower Hamlets install two A7 e-motion ‘Leonardo’ MRL traction lifts in local primary school
Case Study
Having previously worked on a variety of lift projects for Tower Hamlets, including many schools and council buildings, we were approached once more to provide a lift solution for their newly refurbished and extended Smithy Street School. The client required two lifts, one to be situated in the existing building and a second in the new school extension. Both lifts were primarily to be used for wheelchair access to the upper floor. The school, now with its new contemporary look required a design led lift solution to match its modern surroundings.
CI/SfB subheadings under which this case study is classified: