Home > Companies > CCL Wetrooms
190, Strand

190, Strand

Case Study
The Berkeley Groups' stunning London apartments required the installation of wetroom & waterproofing solutions into 188 wetrooms, suitable for a screeded floor construction.
Linear Wall Drains with Stone-Infill Grills were specified into the apartments and penthouses. A high build latex system incorporating insulation boards and HBL-50 levelling compound was installed to the desired depth of 22mm from finished screed level, before the installation of Linear Screed Decs. Linear wall Drains & Stone Infill Grills of varying lengths were installed against the shower walls prior to waterproofing with RIW Tilesafe on the floors and RIW FWM on the walls.

Details

Published 11/12/2018

Subjects

CI/SfB subheadings under which this case study is classified: