Home > Companies > ASSA ABLOY UK

Case studies (18)

Article image
Canary Wharf Elizabeth Line Station
ASSA ABLOY Security Doors delivered a successful project at new Canary Wharf Elizabeth Line Station. Doors needed to be of an extremely high quality, and durable, to withstand high usage levels over prolonged periods of time.Safety was also a key concern due to the scale of the project, and t...
Article image
London Underground
The London Underground has 1.265 billion passengers per year and has been an iconic part of the capital for over 150 years. ASSA ABLOY Security Doors recently supplied its doorsets to various tube stations, including Bond Street, Canary Wharf, Kings Cross, Westminster and Waterloo, as part of...
Article image
Queen Elizabeth Olympic Park
ASSA ABLOY Security Doors supplied steel doorsets to Queen Elizabeth Olympic Park. To meet the performance criteria set out by Poulous, the architect re designing the Olympic Stadium for the London Legacy Development Corporation. The requirements were to supply steel doorsets that meet the ...
Article image
The Shard
ASSA ABLOY Security Doors designed and installed Powershield steel fire doors for the risers of the Spire core, above the viewing galleries, in anticipation of high visitor numbers. The Shard lies on the South Bank in the city’s vibrant new London Bridge Quarter, and is set to “redefine” Lond...
Article image
O2 Arena
AEG Europe, new owners of the Millennium Dome have transformed London’s landmark in to a major entertainments facility. The redevelopment of the 02 Dome, valued at over £600million was completed by main contractor Sir Robert McAlpine. ASSA ABLOY Security Doors Powershield designed, manufactur...
Article image
Birmingham Dental Hospital
ASSA ABLOY UK Specification has helped the UK’s first integrated dental hospital and school for nearly 40 years with 500 timber door sets, door furniture and architectural ironmongery for the prestigious project... Click on the link below to read more.
Article image
Royal Blackburn Hospital
Royal Blackburn Hospital in Lancashire has benefited from a range of timber doorsets fitted with complete ironmongery specified by ASSA ABLOY UK Specification, a UK division of ASSA ABLOY, the global leader in door opening solutions. These robust timber doorsets are not only delivering assured...
Article image
Strawberry Hill Medical Centre
The challenge was to complete a full specification for a former office building that was being redeveloped to bring together Northcroft Surgery and St. Mary’s Surgery, creating the Strawberry Hill Medical Centre. The specification needed to accommodate patient safety, comfort and movement arou...
Article image
Cheltenham Racecourse
The challenge was to complete a full specification for Cheltenham Racecourse, delivered in time for the prestigious 2016 Open, while enabling a continued full race programme during redevelopment. ASSA ABLOY UK Specification supplied steel external and security doors alongside internal timber ...
Article image
UK Specification delivering on London Schools
Little Ilford, Eastbrook and Eastbury Schools all presented distinctive design challenges in terms of access, safety and flow around the building. Added to this was the ever-present pressure to meet with the required standards for a public sector project, which included the need to use BIM lev...
Article image
Flitwick Leisure Centre
This exciting project at Flitwick leisure centre was successfully delivered into the local community. The access and flow requirements of the public building needed to be fully considered during the design phase and a total solution was required for internal and external doorsets... Click on ...
Article image
Kettering Primary School
The Challenges in all schools is to prioritise safety and minimise the risk of injury, while providing a comfortable learning and teaching environment for both pupils and staff. Drawing on a wide range of experience in education sector, ASSA ABLOY UK Specification provided a range of value a...
Article image
RAF Benson Nursery
RAF Benson required an extension to its existing nursery facilities, increasing its capacity to cater for more than 100 children. As a result, the specification process demanded products that were fully compliant and tailored to the needs of the young children that would be using this facility.
Article image
University of Surrey
Looking for an upgrade for their access control system, the University of Surrey in UK worked with Aperio and partner WOT Security to install a range of online Aperio devices integrated with the ARX system... Click on the link below to read more.
Article image
University of Liverpool
Liverpool University new accommodation building required high security without having to modify existing doors. Aperio partners HE Simm, Ocon Construction and ACS were behind the installation off 1,000 Aperio Offline Escutcheons... Click on the link below to read more.
Article image
University of East Anglia
Established in 1963, the University of East Anglia (UEA) is one of England’s leading public research and teaching universities. The university occupies a large campus and sought a locking system for its newest on-site residence, Crome Court. The accommodation has 231 en suite rooms rented to u...
Article image
University of Birmingham
Chamberlain, based in Edgbaston, is a brand new student accommodation development comprised of a 21-storey tower and three low-rise blocks. The student rooms have been fitted with the Aperio® solution, which required full integration into the Gallagher Command Centre, which is an industry le...
Article image
Unversity of Aberdeen
Aperio® brings security and energy efficiency to Aberdeen student accommodation. The University of Aberdeen is one of Scotland’s oldest and most prestigious higher education institutions. As part of a £10 million refurbishment programme, the university sought a modern security solution for it...