Home > Companies > BioClad

Case studies (11)

Article image
BioClad Specified at Wimbledon
Our antimicrobial wall cladding was specified for the multi-million-pound project to develop four commercial kitchens at SW19 to serve the thousands of guests, players, and VIPs who attend The Championships each year. Working alongside a number of contractors, we were heavily involved in the ...
Article image
Goodmayes Hospital
With the client looking to achieve a fully hygienic, long-lasting finish it was only natural to incorporate BioClad’s full suite of products throughout the facility. Working with the client, it was evident that time was an important factor in the project planning process. The 15 working day tu...
Article image
Five Guys - Commercial Kitchens
Cross contamination is a concern for any food prep area dealing with raw meats. With the help of BioCote Technology (found in BioClad products) restaurants can ensure they uphold the highest level of hygiene within food preparation areas. The antimicrobial technology works 24/7 to eliminate th...
Article image
BioClad Complete Plastic Cladding Works on Asiri Hospital, Sri Lanka
BioClad Satin White and Pastel Mint antimicrobial systems, of which are impregnated by BioCote silver ion technology were specified by the client for internal wall linings.
Article image
Full Ward Upgrade At Prominent NHS Trust in Yorkshire
This case study highlights an entire ward refurbishment that was completed using BioPod’s IPS at a prominent Yorkshire based NHS Trust. Units included wash hand basins, WC and WHB for disabled toilets, IPS to cubicles and full wall IPS to consultation rooms.
Article image
BioClad Specified Jananam Indo Lanka Fertility Centre in Colombo, Sri Lanka
Jananam is the 1st Hospital in Sri Lanka to utilise the ‘antimicrobial bubble’ effect by having BioClad for walls & ceilings installed with BioFloor for all clinical areas of the clinic.
Article image
BioClad/BioPod Specified for State-Of-The-Art Veterinary Clinic
After a sustained period of success over a number of years, The Linnaeus Group have expanded it’s referral team and relocated to an 18,000 sq ft centre located at Origin Point on the Paragon Business Park, Wakefield. The client specified BioClad’s range of products to maximise hygiene standard...
Article image
Hinkley Point C Nuclear Power Station
Work has begun on the workers’ accommodation campus at Hinkley Point C and BioClad is supplying and installing its antimicrobial internal wall lining for the units to provide a fully hygienic environment for those working on the project. The campuses will have a total of approximately 1,500 en...
Article image
BioCampus Pharmaceutical Cleanrooms
Requiring optimal hygiene, adhering to industry regulations and requesting antimicrobial protection, a revolutionary new bio-manufacturing science park in Scotland has now installed 2,000 sqm of BioClad in their high standard (ISO Class 5, 6, 7) cleanrooms and labs. BioClad was chosen to ensur...
Article image
Raigmore Hospital Critical Services Upgrade (CSU)
Specified at the design stage Bioclad’s white antimicrobial PVC system along with BioArmis wall protection including bump rails and corner guards were installed through-out this recent healthcare scheme.
Article image
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.
This study aimed to compare levels of bacterial contamination isolated from surfaces in a busy kitchen situated in a UK care home. The study’s main objective was to compare bacterial contamination on the antimicrobial wall cladding with other surfaces in the kitchen. The care home kitchen had ...