Home > Companies > Wöhr Parking Systems > Case study: Wöhr at The Cube
This document contains a full project review of the Wöhr Multiparker 760 automatic system installation at The Cube in Birmingham. The project was completed in 2010 and provides 339 parking spaces in a three story underground car park.

File Details

Date Added 01/05/2013
Download Type PDF
Size 833kb - 1 page

Subjects

CI/SfB subheadings under which this document is classified:

Other downloads by this company

Select a download to view more details:
Document Thumbnail
Product catalogue
A guide to the full range of Wöhr parking systems, including the Parklift range of vertical stack...
 
Document Thumbnail
Case study
Wöhr Parking Systems' Car Display Tower, Brentford case study.
 
Document Thumbnail
Case study
This document contains a full project review of the Wöhr Multiparker 760 automatic system install...

Manufacturer details

Aston Works,
West End,
Aston,
Oxfordshire, OX18 2DQ
Tel +44 (0)1993 851791
Fax +44 (0)1993 851793
Other content by this manufacturer:
Company Overview Downloads (6)