Home > Companies > Kompozit'All UK

Case studies (10)

Article image
Hamptworth Lodge
Kompozit’all UK installation partner Toast had been undertaking a Chimney sweeping contract at the premises. During this it became clear that there was an issue with the flue. After carrying out a CCTV survey inspection on each flue it was revealed that several flues were without any lining an...
Article image
Lartington Hall
This project was undertaken by Kompozit’all UK installation partner “specialist Chimney services”. The existing marble fireplace needed to be made operational. It was decided that Furanflex25 was going to be the most practical solution in maintaining the flue diameter within the chimney stack ...
Article image
Civic Center Challenge
Two new high efficiency condensing boilers fitted into the basement of a nine-story office block using two separate brick lined chimneys through the nine floors on the rooftop. This extremely busy, high-profile office block demanded minimum disruption to the business. The brick chimneys posed...
Article image
Environment Agency River Thames
At the Environment Agency River Thames office (Benson Lock house, Oxfordshire). The Flue for the open fireplace was CCTV surveyed and recorded as became unsafe and required relining. FuranFlex25 RWV was identified as the most suitable lining solution, being non-invasive and capable of expandin...
Article image
Restoring Ventilation
All tenants were able to remain during the renovation process. Exhaust air fans were installed on the roof of the property. A fan on the ceiling at each stairwell was combined with traditional ventilating hoods in the apartments. Prior to the renovation, each apartment had its own fan. A major...
Article image
Heritage Chimney Restoration
Toast Chimney Specialist were called to Hamptworth Lodge to carry out a chimney sweeping project. After conducting a CCTV survey, it was revealed that several flues were without any lining and large gaps with these flues were visible due to old age. This is no surprise considering the building...
Article image
Town Hall Solution
Brighton Town Hall is a Grade 1 Listed property, many attempts had been made to install 300mm diameter Stainless Steel Flexible Liners but failed. During one attempt holes were excavated in the chimney to pull the steel liner through. This failed again and chimney sealant failed to seal the ho...
Article image
Shelbourne Hotel, Dublin
Shelbourne Hotel one of the top hotels in the heart of Dublin City, is a six-storey building. The Main Lobby fireplace has an open fire, serviced by a brick chamber, the brick had deteriorated and now needed replacing. Action Chimneys were given two days to complete the job and had at all time...
Article image
Biomass Boiler Flue
Turner-Baker surveyed the site with a view to finding a flue solution suitable for the boiler, not involving external stainless-steel flues. The survey showed that the existing flue, in its unlined condition, was sufficient for the boiler, but was unsafe to use as it leaked Therefore it was pr...
Article image
Residential Wimbledon, London.
The 2 Furanflex25 RWV fitted to the contour of the flue maintaining the cross-sectional area of the flue, giving a smooth insulated lining to increase the efficiency of the chimney and without any disruption to the construction of the flue. The flue dimensions would not be able to host steel l...