Home > Companies > Pegler Yorkshire
LOCAL AUTHORITY - TECTITE FLEXIBLE

LOCAL AUTHORITY - TECTITE FLEXIBLE

Case Study
THE PROJECT BRIEF:
To install a high performing and reliable system with minimal disruption to residents. Rising concerns with regards to copper theft and fluctuating tube costs also needed to be taken into consideration.

THE SOLUTION:
The Tectite Flexible Metal System by Pegler Yorkshire combines Multi-Layer Composite Pipe and metal push-fit fittings. This combination results in the flexible, flame free and efficient installation associated with PEX systems, whilst providing the performance and integrity of a traditional soldered system. Performance offered by Tectite Flexible Metal enables a connection to be made directly boiler, something other flexible systems cannot claim.

Details

Published 14/01/2016

Subjects

CI/SfB subheadings under which this case study is classified: