Home > Companies > ARDEX UK Ltd
London Aquatic Centre - Olympic Pool

London Aquatic Centre - Olympic Pool

Case Study
866,000 tiles were fixed in the London Aquatics Centre, which formed the gateway to the Olympic Park.
Products used:
ARDEX WPC Waterproof Protection System,
ARDEX S 7 Flexible Waterproof Coating for Floors and Walls,
ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar,
ARDEX X 77 MICROTEC Flexible Wall & Floor Tile Adhesive,
ARDEX-FLEX FL Rapid Setting Flexible Tile Grout for Wide Joints.

Details

Published 22/06/2018

Subjects

CI/SfB subheadings under which this case study is classified: