Home > Companies > Sherwin-Williams High Performance Flooring
London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

Case Study
Sherwn-Williams demonstrated what technical assistance can be provided on projects before any quotations or specifications are organised. A low viscosity primer Resutop Binder was recommended as a penetrating primer to case harden and consolidate the screed. Epoxy screed repairs were installed where required to make good any damaged areas. Once a sound substrate was established Resuprime MVT moisture tolerant primer was installed incorporating a fabric mesh over all joints and pitted areas to reduce any potential cracking of this substrate, followed by 9mm thick FasTop RS69 polyurtehane screed.

Details

Published 09/10/2019

Subjects

CI/SfB subheadings under which this case study is classified: