Home > Companies > Metal Technology Ltd
Metal Technology exemplifies best practice at Leeds College of Building

Metal Technology exemplifies best practice at Leeds College of Building

Case Study
Metal Technology has contributed to achieving the desired aesthetic for the flagship Leeds College of Building Campus designed by Fuse (Leeds). The scheme utilised Metal Technology’s System 17 High Rise capped curtain walling and incorporated manual and automatic 4-20Hi+ casement opening vents. System 5-20D Hi+ doors completed the range of products used. These systems combined to deliver complete design flexibility, achieving not only a very high level of thermal performance, but also exceptional structural, security and acoustic performance. All Metal Technology systems comply with the latest British Standards and are Secured by Design certified.

Details

Published 19/01/2017

Subjects

CI/SfB subheadings under which this case study is classified: