Nelson Project, Plymouth

Nelson Project, Plymouth

Case Study
Celcon Blocks were specified on a 24-unit social housing development in Plymouth. H+H was chosen due to the lightweight properties and ease of use as half of the units were constructed by veterans, many of whom had never worked on a construction site. The site was particularly challenging, with change in levels of 2.5 metres. The physical
constraints of the site meant that
standard articulated delivery vehicles could not be used. This was overcome by H+H visiting site, working closely with them and delivering via Draw Bar vehicle with a crane. U-Value 0.14W/m2K .

Details

Published 02/04/2019