Home > Companies > Saint-Gobain PAM UK
New EEZI-FIT multi-waste manifold installed on project in mayfair

New EEZI-FIT multi-waste manifold installed on project in mayfair

Case Study
The new EEZI-FIT manifold was installed on a project in Mayfair. The product was selected due to the capability of low level waste connection.
Being fire resistant the cast iron manifold requires no fire protection and requires only a 200mm core hole.

Details

Published 20/06/2019

Subjects

CI/SfB subheadings under which this case study is classified: