Home > Companies > Sika Liquid Plastics

Case studies (7)

Article image
SIKA PROVIDES IDEAL SERVICE FOR UNIVERSITY CHAPLAINCY
Constructed in 1969, Lancaster University’s iconic chaplaincy centre is one of the first buildings that come into view when arriving on campus and amongst the university’s most architecturally distinctive. It features three circular roofs which rise in the centre of the building to create a th...
Article image
SIKALASTIC PROVIDES RAPID CURE FOR SOCIAL HOUSING RESIDENTS IN NORWICH
Refurbishment of the walkways was required as part of a wider upgrade programme delivered by main contractor, Thomas Sinden. The existing asphalt covering had been damaged and the resulting water ingress was not only causing leaks into the properties below but was also compromising the buildin...
Article image
LIGHTS, CAMERA, ACTION TO OVERLAY THE ROOF AT PINEWOOD STUDIO
Pinewood Studio in Cardiff may be the location where Dr Who regularly saves the Universe but there was no intergalactic crisis when the building’s 16,000m2 roof needed to be refurbished recently. Instead, Sika Liquid Plastics’ Sikalastic® 625 cold applied liquid membrane provided the ideal sol...
Article image
SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE
All apartments are accessed at the rear of the building via stairs and walkways and the existing asphalt walkway surfaces had blistered, causing various leaks and creating a trip hazard for residents. There was an urgent requirement to carry out the walkway refurbishment while the building rem...
Article image
DECOTHANE IS EFFECTIVE MEDICINE FOR WEST SUFFOLK HOSPITAL ROOF
Sika Liquid Plastics has specified and supplied a roof upgrade solution for West Suffolk Hospital to renew the waterproofing membrane on multiple areas of the hospital campus and create a gradual pitch to aid drainage while enhancing the building’s thermal performance. Delivered by specialist...
Article image
Media City UK
Sika Liquid Plastics produces a range of complete roof systems, and several options were utilised on MediaCityUK. Building C levels 6 and 7 have an inverted roof system with level 7 also having a Decothane Delta 25 warm roof system installed on the upstands. In addition the timber canopy on th...
Article image
Metro Centre
The Metro Centre is over 22 years old and the building had been experiencing leaks, a problem which was exacerbated by the numerous changes in plant installations on the roof. The original felt waterproofing had reached the end of its working life and a system was required that would keep the ...