The Copperworks in Leeds required a floor refurbishment over some 30000 square metres - Sherwin-Williams Resucoat HB product provided the solution.

The Copperworks in Leeds required a floor refurbishment over some 30000 square metres - Sherwin-Williams Resucoat HB product provided the solution.

Case Study
This foundry was previously known as the Leeds Copperworks and has played host to industrial breakthroughs, royal visits, and was the workplace of a 5,000 strong workforce before it closed in 1980.
Preparation included diamond grinding and shotblasting.
Solution
Resuprime OT oil-tolerant primer was applied to prevent delamination.
This was finished with two coats of Resucoat HB, a high-build, low odour, epoxy resin industrial floor coating for high impact and wear resistance.
Outcome
The site has been refurbished with buildings re-roofed and re-clad and a modern warehousing and distribution facility created.

Details

Published 28/08/2019