Home > Companies > Dortek Ltd
The Royal Liverpool University Hospital

The Royal Liverpool University Hospital

Case Study
Following a refurbishment for the hospitals operating theatres, Dortek were asked to replace existing timber doors with a more functional and hygienic alternative. Dortek installed our specialist hermetic sliding doors with automations for easy access. The doors have a unique hermetically sealing gasket system which gives them a 99% air tight seal. After installing the doors the hospital were able to reduce the volume of clean air fed into the theatres by over 20%. Dortek doors have a smooth, void free surface which prevents them from harbouring bacteria and makes them easy to clean for flawless hygiene and infection control.

Details

Published 08/07/2015

Subjects

CI/SfB subheadings under which this case study is classified: