Home > Companies > Sika Limited > Waterproofing Crystal Palace Case Study
In preparation for the 2012 London Olympic Games, the swimming pool in Crystal Palace National Sports Centre has been extended to 50 metres to meet Olympic standards. When it came to the internal waterproofing of the pool, plant rooms and ventilation tunnels, plus repairs to the diving boards, a repeat of the specification that has kept the pool watertight for over 50 years was the natural choice.

File Details

Date Added 01/05/2013
Download Type PDF
Size 406kb - 2 page

Subjects

CI/SfB subheadings under which this document is classified:

Other downloads by this company

Select a download to view more details:
Document Thumbnail
Case study
A refurbishment project that used waterproofing intelligently is The Lancasters in London. The Ge...
 
Document Thumbnail
Technical data sheet
Self levelling PU 'grout' for total vision glazing (TVG fin glazing) and glass balustrade...
 
Document Thumbnail
Product catalogue
Sika is a global company with a world-wide network of subsidiaries active in the fields of specia...

Manufacturer details

Watchmead,
Welwyn Garden City,
Hertfordshire, AL7 1BQ
Tel +44 (0)1707 394444
Fax +44 (0)1707 329129
NBS Plus
NBS National BIM Library
RIBA CPD